STGO 38 & 39 of 2026: FBR Monitoring for Paper and Rexine
STGO 38 & 39 of 2026 (19 Nov): rexine makers need FBR production monitoring by 30 Nov 2026, paper and paperboard mills by 15 Dec 2026.
The short answer
Updated November 2026. By the Digi Invoice team at S.M. Raheel & Company — tax advocates, Faisalabad.
FBR issued two production monitoring orders on 19 November 2026. Sales Tax General Order (STGO) 39 of 2026 covers synthetic leather, commonly called rexine. Every rexine line must run FBR monitoring by 30 November 2026. STGO 38 of 2026 covers paper and paperboard mills. Their deadline is 15 December 2026.
Production monitoring means FBR-approved sensors and cameras measure what each line makes and send the figures to FBR in real time. FBR can then compare that output with the sales you post through FBR Digital Invoicing.
Sources: the FBR orders themselves, read on 21 November 2026. STGO 38: https://download1.fbr.gov.pk/Docs/20261120121164120STGO38of2026.pdf. STGO 39: https://download1.fbr.gov.pk/Docs/20261120121185383STGO39OF2026.pdf. Both are linked from the fbr.gov.pk home page. This guide is general information, not tax advice.
Who must comply with STGO 38 and STGO 39 of 2026?
STGO 38 of 2026 applies to every registered maker of paper and paperboard, including toll manufacturers and composite units that turn their own paper into other products. Units that only cut and print paper are left out. Annex-A of the order lists 45 registered paper and board businesses across 15 tax offices, from Lahore and Karachi to Faisalabad, Peshawar, Multan and Quetta.
STGO 39 of 2026 applies to every registered person who coats, laminates or finishes fabric with PU or PVC (polyurethane or polyvinyl chloride — the plastic layers that make synthetic leather). It also covers units that wind, re-wind, inspect, cut or measure rexine into rolls for sale, and composite units that do both. Toll, conversion and contract manufacturers are included.
Both lists are non-exhaustive (not complete). FBR tells its field offices to find every unit that is missing and bring it in. Being absent from Annex-A does not mean you are exempt.
The legal basis is the same for both: section 40C(2) of the Sales Tax Act, 1990, rules 150ZQR and 150ZQT in Chapter XIV-BA of the Sales Tax Rules, 2006, and S.R.O. 1751(I)/2026 of 7 October 2026. 'FBR Production Monitoring 2026: STGO 27 Camera Rules' explains that earlier S.R.O. and the camera order that came first.
What must a rexine line install by 30 November 2026?
Under STGO 39 of 2026, every synthetic leather line needs four things at the final winder, where finished rolls are cut and taken off. 1) A length sensor turned by the material itself, never by a motor, reading to 0.1 metre. 2) An AI camera that confirms material is running and detects each roll cut. 3) A read-only roll record with its own Roll ID for every roll. 4) A running total of metres per line, shift, day and month.
The system then checks itself. The total length of all roll records in a period must match the line's cumulative running metres. Any gap above 0.5% raises an alert to FBR. Length accuracy must be at least 99% of a reference length, and never below 95%. Each sensor is calibrated at installation against at least 100 metres, with an FBR representative present.
The order also sets record rules. Video is kept at the factory for at least 30 days. Roll records, snapshots and logs are kept for at least 90 days. A failure, damage or tampering must be reported to FBR within one hour. A change of product, line or machine needs 30 days' notice.
FBR has authorised one vendor for this sector: National Radio & Telecommunication Corporation (NRTC). Its contact people are printed in paragraph 7 of the order. The manufacturer pays the vendor fee set under rule 150ZQZD and provides access, internet and power.
What must a paper mill install by 15 December 2026?
Under STGO 38 of 2026, every paper machine and production line needs hardware and software that detects, weighs and counts each SKU (stock keeping unit — one product in one grade and size) by grade and GSM (grams per square metre — how heavy the paper is). Where a mill uses its own paper to make other goods on the same premises, the point where paper leaves the line for that use is monitored too.
FBR has authorised one vendor for paper and paperboard: ISSM Labelling Solutions (Pvt) Ltd, under an authorisation order dated 18 November 2026. Its contact people are printed in paragraph 6 of the order. The mill provides access, IT setup, internet and power, and pays the vendor fee.
The cameras from the earlier order stay. STGO 38 says it is in addition to STGO 27 of 2026, and the video surveillance already installed in paper mills 'shall continue to operate'. So a paper mill ends up with both cameras and weighing and counting equipment.
Each Chief Commissioner Inland Revenue will name a focal person to work with mills and the vendor. If your mill has no vendor contact yet, ask your tax office for that focal person this week.
Can goods leave the factory before the system is running?
No. Both orders apply rule 150ZQT(2) of the Sales Tax Rules, 2006. STGO 39 puts it plainly in paragraph 10:
"no synthetic leather manufacturer shall remove or supply specified goods from its business premises unless the production has undergone monitoring under Chapter XIV-BA and a roll record has been created for every roll through the approved system."
STGO 38 has the same rule for paper and paperboard. STGO 39 also says a manual register, a private camera system or a stand-alone meter counter cannot replace the FBR-approved process. Failure to install, tampering, hiding a line or supplying unmonitored goods is dealt with under the Sales Tax Act, 1990.
In practice, a rexine unit that misses 30 November 2026 risks having its dispatches questioned from 1 December. Paper mills have until 15 December 2026, but vendor queues grow near any deadline.
How will FBR match monitored output with my digital invoices?
Production monitoring does not change how you issue invoices. It changes what FBR can check. STGO 39 tells tax offices to reconcile monitored output with returns, invoices, stock, electricity use and purchases of PVC / PU resin, plasticizers and base fabric.
Worked example (illustrative figures only). In December a rexine line's cumulative running metres show 50,000 metres. The roll records add up to 49,800 metres, a 0.4% gap, so no alert. The unit's digital invoices for the month show 46,500 metres sold, and stock at the factory rose by 2,300 metres. That leaves 1,000 metres with no invoice and no stock record. FBR's dashboard can show that gap the same month.
Three habits keep the figures matched. 1) Invoice rexine in metres (or rolls with a fixed length) and paper in kilograms by grade and GSM, the same units the system records. 2) Use the same product names on invoices as in the vendor's product master. 3) Post every sale on the day of dispatch, and record samples, waste and rejects with a note.
For invoicing rules on paper trading, read 'FBR Digital Invoicing for Paper and Board Merchants and Traders in Pakistan (2026)'. For leather makers, read 'FBR Digital Invoicing for Leather Tanneries and Leather Goods Makers in Pakistan (2026)'. 'FBR E-Invoicing Deadline 2026: Final and Open Deadlines' lists both new dates with the other open FBR orders.
Need help? Contact Digi Invoice — WhatsApp 0300 8680363. Digi Invoice checks each invoice against FBR's digital invoicing rules, works out the tax and posts it through PRAL with the IRN and QR code. Start on the register page.
Difficult words in this guide
Rexine — the common Pakistani name for synthetic leather: fabric coated with PU or PVC.
Roll record — a read-only entry the system makes for each roll, with its Roll ID, length, time and video clip.
Cumulative running metres — the total length a line has produced in a shift, day or month; it does not reset when a roll is cut.
GSM (grams per square metre) — the weight of paper or board; 80 GSM is ordinary office paper.
Toll manufacturer — a unit that makes goods for another business under contract.